| Home --> Galleries --> children's medical --> The Symbol Wall
The Symbol Wall
The Symbol wall is in the works and will be
installed before year-end. Here's a glimpse of the progress so far.
New images at the bottom of the page.
Panel number one, almost done. The blue
tape has the ID for each section.
And now panel number two is finished and
we're working on panels three and four.
A close-up of the letter "S". You can see
the mesh backing between the tiles.
Children's Walls pg. 5 --> |